The Annual Steam Outage is being scheduled for Saturday May 14, 2016 thru the evening of Wednesday May 18, 2016 impacting a number of facilities on campus.
The facilities impacted by the steam outage are as follows:
- Art Annex – Building Heat.
- Blair Shannon House & Dining Center – Domestic Hot Water and Kitchen Hot Water (facility will be in cooling mode).
- Carrington Hall – Building Heat (2nd Floor Auditorium). The remainder of the facility will be in cooling mode.
- Cheek Hall – Building Heat and Reheat.
- Craig Hall – Building Heat.
- Ellis Hall – Building Heat.
- Forsythe Athletic Center – Building Reheat and Domestic Hot Water.
- Foster Family Recreation Center – Building Reheat, Pool Heat, Hot Tub Heat and Domestic Hot Water.
- Freudenberger House – Building Heat and Domestic Hot Water.
- Greenwood Lab School – Building Heat, Reheat and Domestic Hot Water.
- Hill Hall – Building Heat and Reheat.
- Karl’s Hall – Building Heat and Domestic Hot Water.
- Kemper Hall – Building Heat.
- McDonald Arena – Domestic Hot Water (the bowl of the facility will be in ventilation/circulation mode for summer).
- Meyer Library – Building Heat and Reheat.
- Morris Hall (Taylor Health and Wellness Center & Baker Bookstore) – Building Heat (facility will be in cooling mode).
- Plaster Stadium (West Complex/Briggs Stadium/East Bleachers) – Domestic Hot Water and building re-heat (2nd floor classrooms). The remainder of the facility will be in cooling mode for HVAC.
- Plaster Student Union – Building Heat, Reheat and Domestic Hot Water. There will be limited Domestic Hot Water on the standby Electric Domestic Hot Water Heater.
- Power House – The Steam Plant.
- Pummill Hall – Building Heat, Reheat and Domestic Hot Water.
- Strong Hall – Building Heat, Reheat, (HVAC) and Domestic Hot Water.
- Siceluff Hall – Building Heat, Reheat, and Domestic Hot Water.
- Temple Hall – Building Heat, Domestic Hot Water and Lab Steam (the Autoclave).
- Wells House – Building Heat and Domestic Hot Water.
- Woods House – Domestic Hot Water (facility will be in cooling mode).
The Boilers will be secured in the Power House at 12:01 a.m. on the morning of May 14th, securing the steam to the Springfield Campus. The start-up brief will be at 8:05 a.m. in the Central Bay of STMA on May 18st. System pressure should be restored by Midnight that evening.
Please direct questions to Work management at 836-8400 or via E-mail at WorkManagement@MissouriState.edu.