The entrance to Parking Lot 25 will be closed on Wednesday, May 30, 2018 to allow the City of Springfield Department of Public Works to pour a new concrete entrance to the lot. This work will cause lane restrictions on Holland Avenue in the area of the work. The sidewalk in the at the Holland Avenue entrance into Lot 25 will also be closed. Access to Lot 25 will be … [Read more...] about Closure of Lot 25 Entrance from Holland Avenue
Archives for May 2018
Planning, Design & Construction announces a closure associated with the following project: 18-091 Einstein Bagel Modifications, Glass Hall The fire lane and sidewalk North of Glass Hall will be closed on June 4, 2018 with pedestrian access restricted from 7:00 am to 3:00 pm. The contractor will be pouring the new concrete floor at the Einstein Bagel’s infill at Glass … [Read more...] about Closure Notification – Fire Lane / Sidewalk North of Glass Hall
We have been advised by KONE, Elevator Contractor, that in Blair-Shannon House, elevator #6 on the Blair side and elevator #34 on the Shannon side will be out of service from Friday, May 25 through Monday, September 3, 2018. Both elevators are awaiting repairs and parts. Updates will be provided as soon as received. If you have any questions, please contact Work Management … [Read more...] about Blair-Shannon House-Blair Elevator #6/Shannon Elevator #34-Out of Service
We have been advised of an utility interruption at Plaster Center, 5:00p.m. Friday, June 1 through 5:00p.m. Saturday, June 2, 2018. This will impact the entire building for heating, air conditioning and fire protection, due to the shut down of chiller/boiler and fire alarm as part of the mechanical engineering improvements. If you have any questions, please contact Work … [Read more...] about Utility Interruption-Plaster Center
Planning, Design & Construction announces a closure associated with the following project: 18-091 Einstein Bagel Modifications, Glass Hall The sidewalk along the north side of Glass Hall, between the northeast corner and the central point along the building. will be partially closed through the anticipated date of June 6, 2018. Excavation will be occurring on the … [Read more...] about Closure Notification – Glass Hall North Sidewalk