Compressed air will be down in Kemper Hall from 8:00 am until 12:00 pm on Saturday, September 15th. … [Read more...] about Compressed Air Outage – Kemper Hall 9/15/18
Archives for September 2018
The Campus Construction Team will be replacing damaged sidewalks in the historic quad (the area bounded by Hill, Carrington, and Siceluff Halls) during the week of September 17-21. Sidewalks to be replaced include the following: The sidewalk along west edge of Parking Lot 1 from the campus directory kiosk to the south edge of Lot 1. A section of the east–west sidewalk … [Read more...] about Sidewalk Repair Planned September 17th-21st
Glass Hall Elevator #23 is currently out of service. Updates will be provided as received. … [Read more...] about Glass Hall Elevator #23 Out of Service
Planning, Design & Construction announces a closure associated with the following project: 18-046 Hammock Stand Prototype, Springfield Campus The grassy area on the Southeast side of Blair-Shannon House will be closed September 17 to September 21. Excavation will commence for the foundation of a hammock stand prototype. Construction equipment including a backhoe and … [Read more...] about Closure Notification – Southeast Side of Blair-Shannon House
Please be advised that the North stairs on the West side of the Grand Street pedestrian underpass have been closed for repairs until Friday, September 14. Northeast stairs will remain accessible during this time. Please contact Work Management with any questions (6-8400). … [Read more...] about Partial Closure – Grand Street Pedestrian Underpass