A portion of the sidewalk North of McQueary Hall will be closed August 22, 2019 through August 23, 2019 due to City Utilities excavating a portion of the sidewalk at Cherry Street, adjacent to the crosswalk. A temporary asphalt patch will be installed after excavation and concrete will be poured at a later date. The crosswalk will be open as well as the corridor between O’Reilly and McQueary. This work is weather dependent.