In anticipation of the very cold temperatures we are expecting overnight tonight and into next week, we will be transitioning buildings from cooling to heating today. The affected buildings include the following: · Carrington Hall · Cheek Hall · Craig Hall · Plaster Stadium west grandstand · University Bookstore · University … [Read more...] about Building Heat Transition
Archives for November 2022
Planning, Design and Construction announces a campus impact associated with the following project: 21-063 Repair Stone Façade, Pummill Hall From November 16, 2022, through November 23, 2022, the section of Carrington Drive surrounding Pummill Hall will be impacted to move a material crane into the north side yard at Pummill Hall. The material crane will travel from … [Read more...] about Campus Impact Notification – Carrington Drive and Sidewalk on North Side of Pummill Hall
Planning, Design and Construction announces a campus impact associated with the following project: 21-116 Addition & Renovation, Temple Hall From November 7, 2022, through November 23, 2022, there will be pre-design sub-surface drilling at the NE courtyard of Temple Hall. All entry doors will remain open and accessible. There will be a fire hose across some walkways. … [Read more...] about Campus Impact – NE Courtyard of Temple Hall
Several buildings on campus are only capable of being in either the heating or cooling mode at any one time. Due to the complexities of switching buildings from cooling to heating, once we make this switch, it is difficult and labor-intensive to switch back to cooling if the need arises. For this reason, we wait for consistently cool outdoor temperatures before changing … [Read more...] about Annual Transition from Cooling to Heating – Springfield Campus