Several buildings on campus are still only capable of being in either the heating or cooling mode at any one time. Due to the complexities of switching these buildings from heating to cooling, once we make this switch, it is difficult and labor-intensive to switch back to heating if the need arises. For this reason, we wait for consistently warm outdoor temperatures before making the switch.
Those buildings that must be switched from heating to cooling include the following:
- Carrington Hall
- Cheek Hall
- Craig Hall
- Plaster Stadium West grandstand
- University Bookstore
- University Hall
In the past, Facilities Management has transitioned buildings from heating to cooling mode when outdoor temperatures consistently reach highs of approximately 70 degrees and lows remain above 45 degrees. Based on the current weather forecast, we expect to begin transitioning buildings to cooling during the week of April 8, 2024. Be aware that once buildings are transitioned to cooling, temperatures in those buildings first thing in the morning may be cool but should warm up through the course of the day. We expect to have all the above buildings switched to cooling prior to 5:00 p.m. on Friday, April 12.
This information does not apply to facilities within Residence Life, Housing and Dining Services. A separate process is used to determine the timeline for the transition from heating to cooling for those buildings. If you have questions regarding the transition from heating to cooling for facilities within Residence Life, Housing and Dining Services, you can contact them directly via E-mail at ResidenceLifeFacilities@MissouriState.edu.
Please keep in mind that during the transition, each building may go from heating to just forced air ventilation and finally to cooling. Once a building is switched from heating to cooling, that information will be posted on the Administrative Services Notifications blog.
Please feel free to share this with others in your area who might benefit from this information.