Please be advised that the field lights on existing poles at Plaster Stadium are being replaced. As part of this project, Carrington Drive will be closed to both vehicular and pedestrian access from May 12-16, 2025, to allow for work to be completed on the two east poles.
The Bear Line will not stop at the shuttle stop located to the west of Carrington Hall during this time frame. Access to campus from the parking lots south of Grand will be through the west bleacher breezeway or east of Craig Hall. Materials will be unloaded and stored under the east bleachers. The east bleachers will be closed for the duration of the project (5/12/25 – 06/04/25). Areas adjacent to the three west poles will also be closed. See the attached plan for additional information.
UPDATE:
Additional Bear Line Shuttle Stops: The shuttle stop at Carrington Hall will be closed, but two temporary stops will be added to the Silver Route during this time at Lot 1 and the drop off lane at Craig Hall. For questions or concerns regarding the Bear Line, please reach out to the Transportation Team at 417-836-4825 (M-F, 8:00 a.m. – 4:30 p.m.), or our Dispatch Office after hours at 417-836-5509.
Other questions regarding this closure can be directed to Bethany Henry. Thank you.
Discover more from Administrative Services Notifications
Subscribe to get the latest posts sent to your email.