A contractor working for AT&T will be upgrading the cellular antennas and equipment located on the press box at the Plaster Stadium West grandstand. Starting on Monday, June 22, and running through Friday, June 29, a crane will be in place on the plaza at the end of Briggs Street near the stadium box office to lift equipment into place.
While the crane is on site, pedestrian access between Briggs Street and the walkway below the West grandstand will be blocked and the West stadium ramps to the second floor will be closed. The north-south walkway below the west grandstand will remain open and the elevator to the second floor of the west grandstand will be available. See the diagram below for the area that will be blocked.
If you have any questions or concerns please contact Work Management at 417-836-8400 or workmanagement@missouristate.edu. Thank you!