The domestic cold water system for the Professional Building will be down starting at 7:00 a.m. on November 24, 2021. The system will be down for eight (8) hours. If you have any questions, please feel free to contact Work Management at 6-8400 or email workmanagement@missouristate.edu. Thank you. … [Read more...] about Utility Interruption – PROF
The domestic cold water on the first floor of Glass Hall will be shut off on Friday, October 29, 2021. This outage will occur between 2:30 pm and 4:30 pm. If you have any questions, please feel free to contact Work Management at 6-8400 or email workmanagement@missouristate.edu. Thank you. … [Read more...] about Utility Interrupt – Glass Hall First Floor
During the week of September 24th-28th, the Campus Construction Team will be continuing to replace damaged sidewalks in the historic quad (the area bounded by Hill, Carrington, and Siceluff Halls). The affected sidewalk is located along the west edge of Parking Lot 1 from the campus directory kiosk to the east-west sidewalk located immediately south of Lot 1. If you have … [Read more...] about Update: Sidewalk Repairs Planned September 24th-28th
The Campus Construction Team will be replacing damaged sidewalks in the historic quad (the area bounded by Hill, Carrington, and Siceluff Halls) during the week of September 17-21. Sidewalks to be replaced include the following: The sidewalk along west edge of Parking Lot 1 from the campus directory kiosk to the south edge of Lot 1. A section of the east–west sidewalk … [Read more...] about Sidewalk Repair Planned September 17th-21st