We have been informed by KONE, Elevator Contractor, that Glass Hall Elevator #22 repairs have been completed and the elevator is now up and running. Thank you. … [Read more...] about Update-Glass Hall Elevator #22-Operational Now
Planning, Design & Construction announces a closure associated with the following project: 13-081 Renovation and Addition, Glass Hall John Q. Hammons Parkway - Library Loading Dock to the south face of Glass Hall will be closed on December 1, 2017 from 8:00 a.m. to 5:00 p.m. to replace a broken piece of glass on the east face of Glass Hall. Questions regarding this … [Read more...] about Closure Notification: JQH Pkwy – Library Loading Dock
We have just been informed by KONE, Elevator Contractor, that all repairs have been completed on Glass Hall Elevator #23 (Southwest) and it is running and fully operational. Thank you. … [Read more...] about Update-Glass Hall Elevator #23 (Southwest)
Planning, Design & Construction announces a closure associated with the following project: 13-081 Renovation and Addition, Glass Hall As part of the renovation the old Lot 19A (west of Glass Hall) will be removed and turned into green space. Removal of the asphalt and sidewalk necessitates the partial closure of the east end of Lot 20. Spaces directly west of the … [Read more...] about Closure Notification – Glass Hall
We have been informed by KONE, Elevator Contractor, that the following are the proposed dates for each Glass Hall Elevator (South) to be running and fully operational. Glass Hall Elevator #23 (Southwest), Friday, November 17, 2017 Glass Hall Elevator #22 (Southeast), Friday, December 1, 2017 If you have any questions, please contact Work Management, 6-8400. Thank you. … [Read more...] about Update-Glass Elevators #22 and #23 (Southeast and Southwest)