Planning, Design & Construction announces a closure associated with the following project:
18-120 Resurface Pedestrian Ramp at Loading Dock, Plaster Student Union
The loading dock area on the west side of Plaster Student Union will be blocked off from May 25 through June 1 to allow the contractor to resurface the pedestrian ramp that serves the loading dock.
Questions regarding this closure can be directed to Adam Shuler.