Several buildings on campus are only capable of being in either the heating or cooling mode at any one time.  Due to the complexities of switching buildings from cooling to heating, once we make this switch, it is difficult and labor-intensive to switch back to cooling if the need arises.  For this reason, we wait for consistently cool outdoor temperatures before changing over.

Buildings that must be switched from cooling to heating include the following:

  • Carrington Hall
  • Cheek Hall
  • Craig Hall
  • Plaster Stadium west grandstand
  • University Bookstore
  • University Hall

In the past, Facilities Management has transitioned buildings from cooling to heating mode when outdoor temperatures consistently reach highs of 54-57 degrees or less.  Based on the upcoming weather forecast, we are planning to begin transitioning buildings to heating during the second or third week of November.  We will continue to monitor the weather and adjust the building heating transition schedule as appropriate.

This information does not apply to facilities within Residence Life, Housing and Dining Services.  A separate process is used to determine the timeline for transition from cooling to heating for those buildings.  If you have questions regarding the transition for facilities within Residence Life, Housing and Dining Services you can contact them directly via E-mail at ResidenceLifeFacilities@MissouriState.edu.

Please keep in mind that during the transition, each building may go from cooling, to just forced air ventilation, and finally to heating.  Once a building is switched from cooling to heating that information will be posted on the Administrative Services Notifications blog.

Please feel free to share this with others in your area who might benefit from this information.

Thank you for your patience and cooperation as we do our best to serve you.

 


Discover more from Administrative Services Notifications

Subscribe to get the latest posts sent to your email.

Tagged With: air conditioning, cooling, heating, Uncategorized, Utilities

Recent Posts

  • Closure Notification – McDonald Arena and Surrounding Areas
  • Boiler Tuning and Venting of Steam, October 8 to October 11
  • Fire Alarm System Upgrade Successfully Completed
  • Fire Alarm System Upgrade Scheduled for September 30, 2026
  • Peak Utility System Demands

Recent Comments

  • Walking Challenge, Homebuying 101, Diabetes and GLP-1's - Wellness Works on Boiler Tuning and Venting of Steam, October 8 to October 11
  • Walking Challenge, Weight Watchers, Homebuying 101, Diabetes and GLP-1's - Wellness Works on Fire Alarm System Upgrade Scheduled for September 30, 2026
  • Pickleball, Diabetes Ed., Homebuying, Walking Challenge, Nutrition Counseling/Talks - Wellness Works on Fire Alarm System Upgrade Scheduled for September 30, 2026

Archives

Categories

  • Administrative Services
  • Custodial Services
  • Facilities Management
  • Job Fair
  • Parking
  • Planning, Design & Construction
  • Safety and Transportation
  • Shuttle
  • Uncategorized
  • University Support Services

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Accessibility
  • Disclaimer
  • Disclosures
  • Equal Opportunity Employer and Institution
  • © 2026 Board of Governors, Missouri State University
  • Contact Information