Missouri State University

Skip to content Skip to navigation
a b c d e f g h i j k l m n o p q r s t u v w x y z

Administrative Services Notifications

JQH Parkway Closure Notification – Kemper Hall Addition

May 1, 2024 by John Oo

Please be advised that the stormwater drainage work on John Q Hammons Pkwy as part of the Kemper Hall Addition project will impact traffic, parking and shuttles from May 13, 2024, until June 7, 2024. Street Closures: A section of John Q Hammons Pkwy between Briggs Street and Madison Street will be closed to through traffic. The MSU Busway will also be closed between Bear … [Read more...] about JQH Parkway Closure Notification – Kemper Hall Addition

Filed Under: Planning, Design & Construction Tagged With: JQH Parkway, Kemper Hall, Lot 19 closure, shuttle changes, Street closure

Closure Notification – South Clay Avenue and Bear Park South East Entry/Exits

March 11, 2024 by John Oo

Please be advised that the east entry/exit of Bear Park South and the section of South Clay Avenue off Grand Street will be closed from March 12, 2024, until March 13, 2024, for asphalt patching on South Clay Avenue. Those utilizing Bear Park South will need to use the west entry/exit during this closure. Questions regarding this project can be directed to Shanon Mitchell … [Read more...] about Closure Notification – South Clay Avenue and Bear Park South East Entry/Exits

Filed Under: Planning, Design & Construction Tagged With: Bear Park South, Clay Avenue, Closure

Closure Notification – North Building Entrance, Kemper Hall

January 9, 2024 by John Oo

Please be advised that the north entry/exit and north stair tower at Kemper Hall will be closed from January 12, 2024, until December 31, 2024, for the demolition and construction of the addition to the building. The north stair tower will be demolished, and other entry/exit points will need to be used until the new addition is constructed. A temporary emergency egress from the … [Read more...] about Closure Notification – North Building Entrance, Kemper Hall

Filed Under: Planning, Design & Construction Tagged With: Closure, Kemper Hall

Closure Notification – Lot 24, Springfield Campus

December 15, 2023 by John Oo

Please be advised that the blue parking lot that is located on the east side of the Grand Street Pedestrian Underpass ramp will be closed beginning the evening of December 17, 2023, until the evening of December 22, 2023, for sewer work. The yellow commuter lot that is located on the west side of the Grand Street Pedestrian Underpass ramp will remain open with the exception of … [Read more...] about Closure Notification – Lot 24, Springfield Campus

Filed Under: Planning, Design & Construction Tagged With: Lot 24 closure, Parking lot closure

Closure Notification – Holland Avenue

December 14, 2023 by John Oo

Please be advised that a section of Holland Avenue at the northeast corner of Heitz House will be closed from December 18, 2023, through December 22, 2023 to readjust the building sign. The street can be detoured through parking lots 20 and 20A with caution. Questions regarding this closure can be directed to Yo Satake at YoSatake@missouristate.edu. … [Read more...] about Closure Notification – Holland Avenue

Filed Under: Planning, Design & Construction Tagged With: Heitz House, Holland Avenue, Street closure

Next Page »

Recent Posts

  • Update: Campus Impact – Power Outage
  • Update: Campus Impact – Power Outage
  • Update: Campus Impact – Power Outage
  • Update: Campus Impact – Power Outage
  • Campus Impact – Power Outages

Recent Comments

  • - Wellness Works on Annual Steam Outage from May 09 – 14, 2025
  • Free Baseball Tickets, Summer Sizzle Cooking, Refer a Bear and Tax Day - Wellness Works on Cooling System Changeover Expected This Week
  • Walking Challenge March 24, Weight Watchers and Mental Health First Aid Training - Wellness Works on Lunar Eclipse View Tonight, March 13
  • Walking Challenge March 24, Weight Watchers and Mental Health First Aid Training - Wellness Works on Missouri State University Recognized as Tree Campus USA and Bee Campus USA for 2025
  • Wellness Works on Possible Traffic Delays Tuesday, August 13, 2024

Archives

Tags

air conditioning Basketball Parking Bear Boulevard Blunt Hall Carrington Hall Cheek Hall Cherry Street Closure construction cooling Craig Hall Elevator Event Parking Glass Hall Greenwood Laboratory School heating JQH Arena JVIC Karls Hall Kemper Hall Lot 15A Meyer Library outage Parking Parking lot closure Parking lot closures Parking Lots Plaster Center for Free Enterprise plaster stadium Professional Building property control shuttle changes Shuttles Shuttle Schedule sidewalk Sidewalks Street Street closure Strong Hall Temple Hall TMA Utilities utility interruption water outage work request

Categories

  • Administrative Services
  • Custodial Services
  • Facilities Management
  • Job Fair
  • Parking
  • Planning, Design & Construction
  • Safety and Transportation
  • Shuttle
  • Uncategorized
  • University Support Services

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Make your Missouri statementMake your Missouri statement
  • Last Modified: December 14, 2023
  • Accessibility
  • Disclaimer
  • Disclosures
  • Equal Opportunity Employer and Institution
  • © 2025 Board of Governors, Missouri State University
  • Contact Information
  • Healthcare MRFs