Missouri State University

Skip to content Skip to navigation
a b c d e f g h i j k l m n o p q r s t u v w x y z

Administrative Services Notifications

Update-Utility Interruption-Plaster Student Union-Fire Alarm outage 9/10/2021 Canceled

September 9, 2021 by Susan Scott

We were informed that, due to a contractor issue, the fire alarm outage scheduled for tomorrow, Friday, September 10, 2021 at Plaster Student Union, 1st floor renovation of MRC and OSE, and affecting the entire building, has been canceled and will be rescheduled.  Thank you. … [Read more...] about Update-Utility Interruption-Plaster Student Union-Fire Alarm outage 9/10/2021 Canceled

Tagged With: Facilities Management, Plaster Student Union, Utilities

Utility Interruption-Plaster Student Union-1st floor Renovation for MRC and OSE

August 9, 2021 by Susan Scott

We have been informed of an utility interruption of the fire protection system, at Plaster Student Union, 7:00a.m. to 5:00p.m. Wednesday, August 11; 7:00a.m. to 5:00p.m. Thursday, August 12; and 7:00a.m. to 5:00p.m. Friday, August 13, 2021, at which time the job will be completed.  This will affect the entire building and is part of the first floor renovation for MRC and OSE … [Read more...] about Utility Interruption-Plaster Student Union-1st floor Renovation for MRC and OSE

Tagged With: Facilities Management, Plaster Student Union, Utilities

Utility Interruption-Fire Protection-Plaster Student Union, MRC and OSE renovation

July 22, 2021 by Susan Scott

We have been notified of an utility interruption of the fire protection system at Plaster Student Union, Thursday, July 29, 2021, 7:00a.m through 5:00p.m. Friday, July 30, 2021.  This impacts the entire building, and is to allow installation of fire sprinkler flex pipe and heads.  This is part of the first floor renovation for MRC and OSE (located in the former bowling … [Read more...] about Utility Interruption-Fire Protection-Plaster Student Union, MRC and OSE renovation

Tagged With: Facilities Management, Plaster Student Union, Utilities

Closure Notification – East Entrance, 2nd Floor, Plaster Student Union

April 16, 2018 by

Planning, Design & Construction announces a closure associated with the following project: 18-068 Renovation of Room 216, Plaster Student Union The East entrance on the second floor of the Plaster Student Union will be temporarily blocked through April 17, 2018 to allow for installation of a generator to the north-east side of the building. Questions regarding this … [Read more...] about Closure Notification – East Entrance, 2nd Floor, Plaster Student Union

Filed Under: Planning, Design & Construction Tagged With: Closure, Plaster Student Union

« Previous Page

Recent Posts

  • Key Control – Limited Access Tomorrow, Thursday, June 11
  • Boiler Repair Requiring Venting of Steam, Saturday, 6/13/26
  • Coming July 1:  Digital Project Request Form (PRF) Submission Process
  • Frank Ruzicka Retirement Celebration – Friday, May 29
  • New Blunt Hall Elevator Down for Service on Thursday, 5/28/26

Recent Comments

  • Travel Safety, In-Network Care, Feel Good Flow, Summer Research - Wellness Works on Boiler Repair Requiring Venting of Steam, Saturday, 6/13/26
  • Travel Safety, In-Network Care, Feel Good Flow, Summer Research - Wellness Works on Key Control – Limited Access Tomorrow, Thursday, June 11
  • Weight Watchers, Parenting, More Than a Paycheck, Picnic w/ Chartwells - Wellness Works on Boiler Repair Requiring Venting of Steam, Saturday, 6/13/26

Archives

Categories

  • Administrative Services
  • Custodial Services
  • Facilities Management
  • Job Fair
  • Parking
  • Planning, Design & Construction
  • Safety and Transportation
  • Shuttle
  • Uncategorized
  • University Support Services

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Accessibility
  • Disclaimer
  • Disclosures
  • Equal Opportunity Employer and Institution
  • © 2026 Board of Governors, Missouri State University
  • Contact Information