Planning, Design and Construction announces a closure notification associated with the following project:
21-072 Elevator Pit Repairs (Springfield Campus), University Hall
From July 11, 2022, through August 1, 2022, the University Hall elevator will be taken offline to complete repairs to the elevator pit in order to mitigate water infiltration. The repairs are needed in order to pass inspection and keep the elevator in operation. The elevator will be out of commission while the repairs are made.
Questions can be directed to Adam Shuler at adamshuler@missouristate.edu.