Missouri State University

Skip to content Skip to navigation
a b c d e f g h i j k l m n o p q r s t u v w x y z

Administrative Services Notifications

Closure Notification – Area Surrounding the Center West Press Box Light Pole at Plaster Stadium

May 19, 2025 by Ashley Sliger

Please be advised that the replacement of the field lights on the existing poles at Plaster Stadium is still in progress. Work on the east poles has been completed, and Carrington Drive has been reopened to both vehicular and pedestrian traffic. Materials continue to be stored under the east bleachers, which will remain closed for the duration of the project (May 12, 2025 – … [Read more...] about Closure Notification – Area Surrounding the Center West Press Box Light Pole at Plaster Stadium

Filed Under: Planning, Design & Construction Tagged With: Closure

Closure Notification – Carrington Drive

May 8, 2025 by Ashley Sliger

Please be advised that the field lights on existing poles at Plaster Stadium are being replaced. As part of this project, Carrington Drive will be closed to both vehicular and pedestrian access from May 12-16, 2025, to allow for work to be completed on the two east poles. The Bear Line will not stop at the shuttle stop located to the west of Carrington Hall during this time … [Read more...] about Closure Notification – Carrington Drive

Filed Under: Planning, Design & Construction Tagged With: Carrington Drive, Closure

Closure Notification – Carrington Drive

April 22, 2025 by Ashley Sliger

Please be advised that the Plaster Stadium field lights on the existing poles are being replaced. Carrington Drive, which is located to the east of the east bleachers, will be closed to vehicular and pedestrian access from 5/12/25 - 5/16/25 to replace the lights on the two east poles. The Bearline will not stop at the bus station located to the west of Carrington during this … [Read more...] about Closure Notification – Carrington Drive

Filed Under: Planning, Design & Construction Tagged With: Carrington Drive, Closure

Closure Notification – Turf Replacement, Plaster Stadium

March 14, 2025 by Ashley Sliger

Please be advised that the field turf is being replaced at Plaster Stadium. The field area will be closed throughout the entire project timeline, 04/07/25 - 05/16/25. Spaces that are only accessible from the field in the east and west bleachers will be inaccessible during the project timeline. Materials will be loaded and unloaded through the plaza and gate that is located on … [Read more...] about Closure Notification – Turf Replacement, Plaster Stadium

Filed Under: Planning, Design & Construction Tagged With: Closure

Closure Notification – Plaster Stadium West Sidewalk from Stadium Ramp to North End of Stadium

March 12, 2025 by Ashley Sliger

Please be advised that the Plaster Stadium west sidewalk from the stadium ramp to the north end of the stadium will be closed from 3/15/25 - 3/23/25 to complete the exterior of the Blunt Hall Addition and begin landscaping. Questions regarding this closure can be directed to Laura Derrick. … [Read more...] about Closure Notification – Plaster Stadium West Sidewalk from Stadium Ramp to North End of Stadium

Filed Under: Planning, Design & Construction Tagged With: Closure, sidewalk

Next Page »

Recent Posts

  • Closure Notification – Area Surrounding the Center West Press Box Light Pole at Plaster Stadium
  • Kampeter Fire Protection Water Outage
  • Kampeter Health Science Hall, Ann Water Outage
  • Closure Notification – Carrington Drive
  • Annual Steam Outage from May 09 – 14, 2025

Recent Comments

  • - Wellness Works on Annual Steam Outage from May 09 – 14, 2025
  • Free Baseball Tickets, Summer Sizzle Cooking, Refer a Bear and Tax Day - Wellness Works on Cooling System Changeover Expected This Week
  • Walking Challenge March 24, Weight Watchers and Mental Health First Aid Training - Wellness Works on Lunar Eclipse View Tonight, March 13
  • Walking Challenge March 24, Weight Watchers and Mental Health First Aid Training - Wellness Works on Missouri State University Recognized as Tree Campus USA and Bee Campus USA for 2025
  • Wellness Works on Possible Traffic Delays Tuesday, August 13, 2024

Archives

Tags

air conditioning Basketball Parking Bear Boulevard Blunt Hall Carrington Hall Cherry Street Closure construction cooling Craig Hall Elevator Event Parking Glass Hall Greenwood Laboratory School heating JQH Arena JVIC Karls Hall Kemper Hall Lot 15A Meyer Library outage Parking Parking lot closure Parking lot closures Parking Lots Plaster Center for Free Enterprise plaster stadium Professional Building property control shuttle changes Shuttles Shuttle Schedule sidewalk Sidewalks Street Street closure Strong Hall Temple Hall TMA Utilities utility interruption water water outage work request

Categories

  • Administrative Services
  • Custodial Services
  • Facilities Management
  • Job Fair
  • Parking
  • Planning, Design & Construction
  • Safety and Transportation
  • Shuttle
  • Uncategorized
  • University Support Services

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Make your Missouri statementMake your Missouri statement
  • Last Modified: March 12, 2025
  • Accessibility
  • Disclaimer
  • Disclosures
  • Equal Opportunity Employer and Institution
  • © 2025 Board of Governors, Missouri State University
  • Contact Information
  • Healthcare MRFs