Planning, Design & Construction announces a closure associated with the following project: 16-027 FY16 ADA Improvements, Carrington Hall Beginning 5:30 p.m., December 19, 2016 through 5:00 p.m., January 4, 2017, the first floor women’s restroom in Carrington Hall will be closed for ramp replacement, partition wall demolition, and relocation/addition of new restroom … [Read more...] about Closure Notification – First Floor Restrooms, Carrington Hall
Planning, Design & Construction announces a closure associated with the following project: 17-020 Floor Cracking in Weight Room, Hammons Student Center On Saturday, December 10, 2016 from 6:00 a.m. to 4:00 p.m., Hammons Student Center will be closed for non-destructive material testing. Questions regarding this closure can be directed to Mark Wheeler. … [Read more...] about Closure Notification – Hammons Student Center
This project is completed and the elevators are now available for use. Planning, Design & Construction announces a closure associated with the following project: 17-002 Repair Elevator Hydraulic Piping, Bear Park North In order to repair leaks in the hydraulic piping, the elevators in the southwest corner of Bear Park North will be blocked off and out of service … [Read more...] about Closure Notification – Southwest Elevators at Bear Park North
Update at 4:35pm, 11-3-16: Due to last night's rain, the area needs time to dry. Therefore, this notice is being updated to show Lot 5 closure will take place November 12, 2016. Planning, Design & Construction announces a closure associated with the following project: 16-062 Improve District Chilled Water System, Campus Utilities, Phase I On Saturday, … [Read more...] about Update to Closure Notification – Lot 5
Planning, Design & Construction announces a closure associated with the following project: 16-062 Improve District Chilled Water System, Campus Utilities, Phase I Beginning the evening of Friday, October 21, 2016 through the morning of Saturday, October 22, 2016, Lot 5 will be closed to remove the condensing units between Kings Street and Forsythe Athletics. A crane … [Read more...] about Closure Notification – Lot 5