We have been informed by KONE, Elevator Contractor, that repairs have been made and Sunvilla elevator #37 (West) is returned to service. Thank you. … [Read more...] about Update-Sunvilla Elevator #37-Returned to Service
Archives for May 2019
Parking Lots 7 (by the bookstore) and 16 (Florence St) will be closed for 2 weeks beginning on Monday, June 3, 2019 for Lot Maintenance. You may still use the Visitor lot 14 and Magers Health lot 6, but access will be limited during this time. For any questions or concerns please contact the Parking Services Office at (417)836-4825 … [Read more...] about Closure / Maintenance for Lots 7 and 16
We have been informed of an utility interruption of power (electrical) in Craig Hall, Sunday, June 2, 3:00p.m. - 7:00p.m. This will affect the entire building, there will be no lighting, HVAC or water and is to replace a 1000 amp breaker on the main electrical panel. If you have questions, please contact Work Management at 6-8400. Thank you. … [Read more...] about Utility Interruption-Electrical Power-Craig Hall-Sunday, June 2, 2019
We have been informed there will be an utility interruption of the domestic water in Carrington Hall, Friday, May 31, 6:00a.m.-8:00a.m. This will affect the entire building and is for replacement of leaking domestic water isolation valves in room 204. If you have any questions, please contact Work Management at 6-8400. Thank you. … [Read more...] about Utility Interruption-Carrington Hall-Domestic Water-May 31, 2019
Please be advised that the ventilation systems at Carrington Hall will be upgraded this summer. The work to be performed includes replacing two air handling units on the roof, adding new piping from the basement to the roof for future use, and installing a reheat unit and carbon dioxide sensors in the auditorium. Work will commence May 28 and be complete before the fall … [Read more...] about Ventilation System Upgrades at Carrington Hall