Several buildings on campus are only capable of being in either the heating or cooling mode at any one time. Due to the complexities of switching buildings from cooling to heating, once we make this switch, it is difficult and labor-intensive to switch back to cooling if the need arises. For this reason, we wait for consistently cool outdoor temperatures before changing … [Read more...] about UPDATED Annual Transition from Cooling to Heating
Archives for October 2023
Cheek’s domestic water system is now back on after maintenance work was done on October 26, 2023. Please call Facilities Management at (417) 836-8400 for any questions you may have. Thank you. … [Read more...] about Cheek Water Back On
Several buildings on campus are only capable of being in either the heating or cooling mode at any one time. Due to the complexities of switching buildings from cooling to heating, once we make this switch, it is difficult and labor-intensive to switch back to cooling if the need arises. For this reason, we wait for consistently cool outdoor temperatures before changing … [Read more...] about Annual Transition from Cooling to Heating
Please be advised that the alley between Karls Hall and Art Annex will be closed from October 25, 2023, until October 27, 2023, to allow a small drill rig to obtain soil samples at four locations around the Art Annex. A portion of the sidewalk at the southwest corner of Art Annex will also be closed on October 25, 2023, and will reopen on October 26, 2023. Questions … [Read more...] about Closure Notification – Areas around Karls Hall and Art Annex
A consultant will be on campus the week of October 30, 2023, to evaluate building exterior entrances on the Springfield campus, including both Academic and Residence Life buildings. This is intended to assist in our efforts to pinpoint accessible exterior entrances and note accessibility improvement opportunities. This evaluation process will not cause any scheduled … [Read more...] about Exterior Entrances Evaluation – Week of October 30th