Missouri State University

Skip to content Skip to navigation
a b c d e f g h i j k l m n o p q r s t u v w x y z

Administrative Services Notifications

Utility Interruption – Chilled Water; Carrington Hall

August 8, 2019 by Abby Brown

Due to mechanical work in conjunction with the roof replacement project, chilled water will be shut down in Carrington Hall from 5 pm, Friday, August 9th until 4 pm, Sunday, August 11th.  This will impact Air Conditioning for the entire building. Please contact Work Management with any questions or concerns (836-8400). … [Read more...] about Utility Interruption – Chilled Water; Carrington Hall

Tagged With: air conditioning, Facilities Management, outage

Transition from Cooling to Heating

October 17, 2018 by Abby Brown

Several buildings on campus are still only capable of being in either the heating or cooling mode at any one time.  Though the district chilled water system eliminated some of the complexities of switching buildings from cooling to heating, once we make this switch, it is difficult and labor-intensive to switch back to cooling if the need arises.  For this reason, we wait for … [Read more...] about Transition from Cooling to Heating

Tagged With: air conditioning, cool, Facilities Management, heat, heating, seasonal, transition

Transition from Heat to Air Conditioning

April 12, 2018 by Abby Brown

Several buildings on campus are still only capable of being in either the heating or cooling mode at any one time.  Though the district chilled water system eliminated some of the complexities of switching buildings from heating to cooling, once we make this switch, it is difficult and labor-intensive to switch back to heating if the need arises.  For this reason, we wait for … [Read more...] about Transition from Heat to Air Conditioning

Tagged With: air conditioning, Facilities Management, heat, transition, Utilities

« Previous Page

Recent Posts

  • Closure Notification – McDonald Arena and Surrounding Areas
  • Boiler Tuning and Venting of Steam, October 8 to October 11
  • Fire Alarm System Upgrade Successfully Completed
  • Fire Alarm System Upgrade Scheduled for September 30, 2026
  • Peak Utility System Demands

Recent Comments

  • Walking Challenge, Homebuying 101, Diabetes and GLP-1's - Wellness Works on Boiler Tuning and Venting of Steam, October 8 to October 11
  • Walking Challenge, Weight Watchers, Homebuying 101, Diabetes and GLP-1's - Wellness Works on Fire Alarm System Upgrade Scheduled for September 30, 2026
  • Pickleball, Diabetes Ed., Homebuying, Walking Challenge, Nutrition Counseling/Talks - Wellness Works on Fire Alarm System Upgrade Scheduled for September 30, 2026

Archives

Categories

  • Administrative Services
  • Custodial Services
  • Facilities Management
  • Job Fair
  • Parking
  • Planning, Design & Construction
  • Safety and Transportation
  • Shuttle
  • Uncategorized
  • University Support Services

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
  • Accessibility
  • Disclaimer
  • Disclosures
  • Equal Opportunity Employer and Institution
  • © 2026 Board of Governors, Missouri State University
  • Contact Information