Several buildings on campus are still only capable of being in either the heating or cooling mode at any one time. Due to the complexities of switching these buildings from heating to cooling, once we make this switch it is difficult and labor-intensive to switch back to heating if the need arises, we wait for consistently warm outdoor temperatures before making the … [Read more...] about Updated Transition from heating to cooling in academic buildings – Springfield Campus
Due to mechanical work in conjunction with the roof replacement project, chilled water will be shut down in Carrington Hall from 5 pm, Friday, August 9th until 4 pm, Sunday, August 11th. This will impact Air Conditioning for the entire building. Please contact Work Management with any questions or concerns (836-8400). … [Read more...] about Utility Interruption – Chilled Water; Carrington Hall
Several buildings on campus are still only capable of being in either the heating or cooling mode at any one time. Though the district chilled water system eliminated some of the complexities of switching buildings from cooling to heating, once we make this switch, it is difficult and labor-intensive to switch back to cooling if the need arises. For this reason, we wait for … [Read more...] about Transition from Cooling to Heating
Several buildings on campus are still only capable of being in either the heating or cooling mode at any one time. Though the district chilled water system eliminated some of the complexities of switching buildings from heating to cooling, once we make this switch, it is difficult and labor-intensive to switch back to heating if the need arises. For this reason, we wait for … [Read more...] about Transition from Heat to Air Conditioning