Planning, Design & Construction announces a closure associated with the following project:
18-068 Renovation of Room 216, Plaster Student Union
The East entrance on the second floor of the Plaster Student Union will be temporarily blocked through April 17, 2018 to allow for installation of a generator to the north-east side of the building.
Questions regarding this closure can be directed to Adam Shuler.