Planning, Design and Construction announces a closure associated with the following project:
20-065 John Goodman Amphitheatre
From January 20th through January 28th, 2022, the contractor will be installing the remaining masonry on the cantilevered beam that overhangs the northwest sidewalk by Craig Hall. The sidewalk will be temporarily closed during the installation. The north entrance to Craig Hall will remain open but access to that entrance will only be from the east.
Questions regarding this closure can be directed to Michael Mardis at michaelmardis@missouristate.edu.