Flooring updates will be occurring during winter break in Carrington Hall west entrances and hallways. These will be closed or have limited access during winter break- 12/21 through 1/05. Northwest Entrance and Hallway – Closed Sunday 12/22, Monday 12/23 Limited access Thursday 12/26 and Friday 12/27 Southwest Entrance and Hallway – Closed … [Read more...] about Closure Notification – Carrington Hall
Work will occur on the ceilings at Carrington Hall. This will begin Monday, November 25th. The work will occur on the third floor near the elevator. During construction, all offices, stairway, and elevator will remain open and accessible. The construction in this areas should be complete before winter break. Eric Easter can answer questions regarding this … [Read more...] about Construction Notification – Carrington Hall
A large piece of equipment is being delivered by semi-truck for the Classroom Addition in McQueary Hall project on Tuesday, October 1. The parking spaces directly south of the construction fence gate to Harrison Street, approximately 24 spaces, will be closed for the day to allow the equipment to be safely unloaded. The spaces will reopen that day upon the completion of the … [Read more...] about Closure Notification – McQueary Hall – Lot 35
Starting at 12:30 pm on Friday, July 12 the water and compressed air will be shut off for the entire building to allow the contractor to make connections for renovation work in Room 105. The work will take approximately 4 hours. … [Read more...] about Closure Notification – Kemper Hall
Planning, Design & Construction announces a closure associated with the following project: 18-043 Glass Replacement, Foster Recreation Center Due to the weather forecast for 5/21, the glass replacement has been rescheduled for 5/23. A second floor glass unit on the west side of the main entrance at Foster Recreation Center will be replaced on 5/23/19 starting at … [Read more...] about UPDATE – Closure Notification – Lot 11 and Foster Recreation Center West Sidewalk