From November 28, 2023, through December 21, 2023, Precision Concrete Cutting will be on campus to grind sidewalk hazards. Work will be done at the perimeter of the Springfield campus in the first two weeks and the internal areas of campus will be completed the first week of winter break. No work will be performed during finals week. Questions regarding this campus impact … [Read more...] about Campus Impact Notification – Sidewalks around Springfield Campus
A consultant will be on campus the week of October 30, 2023, to evaluate building exterior entrances on the Springfield campus, including both Academic and Residence Life buildings. This is intended to assist in our efforts to pinpoint accessible exterior entrances and note accessibility improvement opportunities. This evaluation process will not cause any scheduled … [Read more...] about Exterior Entrances Evaluation – Week of October 30th
A consultant will be on campus the week of October 9, 2023, and October 30, 2023, to evaluate building exterior entrances on the Springfield campus, including both Academic and Residence Life buildings. This is intended to assist in our efforts to pinpoint accessible exterior entrances and note accessibility improvement opportunities. This evaluation process will not cause any … [Read more...] about Exterior Entrances Evaluation – Week of October 9th and October 30th
We will be experiencing a peak load on the district chilled water system and peak demand on our electrical systems this week. With outside air temperatures today thru Monday averaging 102.8 degrees F. and heat indexes above 100 degrees F. our campus systems will be strained. To reduce the stress on our campus systems, conserve energy, and reduce the cost of peak utility … [Read more...] about Energy Conservation During Extreme Heat