Planning, Design and Construction announces a campus impact associated with the following project: 18-130 Building 4 Expansion, Jordan Valley Innovation Center From March 28th through April 1st, 2022, the work to remove the existing parking lot islands and area for the new dumpster location will commence. Please use the Boonville access and avoid the east entrance to the … [Read more...] about Campus Impact – JVIC North Parking Lot
Please be advised of sidewalk work being completed on the sidewalk along the south side of Bear Boulevard between Parking Lot 10A (near the Networking and Telecommunications wing of Blair-Shannon) and the Blair-Shannon loading dock to allow for the replacement of the north water service to the campus. Bear Boulevard should remain passable during this work but lane width may be … [Read more...] about North Water Service Repairs-Sidewalk Work
Planning, Design & Construction announces a closure associated with the following project: 16-062 Improve District Chilled Water System Phase II, Campus Utilites Monday, February 6, 2017, precast concrete wall panels will be installed with the help of a crane. The crane will sit in the east third of parking lot 30 for the day. The east drive lane of parking lot 30, … [Read more...] about Closure Notification- Campus Utilities
Planning, Design & Construction announces a closure associated with the following project: 16-062 Improve District Chilled Water System, Campus Utilities Lot 5 will be closed on 11/23/16 to facilitate backfilling a ditch between Kings Street and Forsythe Athletics. The lot will be returned for use at the end of the day. Questions regarding this closure can be … [Read more...] about Closure Notification – Lot 5 between Forsythe and Kings Street
The Campus Construction Team (CCT) will be making repairs to two concrete islands on parking lot 28 on Tuesday, September 6th. The lot will remain open, as well as all parking spaces. You may contact Andy Smith, CCT Manager, with any questions at 6-6057 or AHSmith@missouristate.edu … [Read more...] about Concrete Repair on Lot 28 – Sept. 6